undiscovered. undervalued. unattainable. until NOW!

Check back often!

Before and After


Rehabbed Homes
Shultas Project
West Ivy Project
Woosley Project
Donald Project
North High Project
Wilson Project
Clowes Project

Paul Esajian, star of A&E®'s hit TV show "Flip This House," is one of the nation's premier real estate investors, building his own company, CT Homes LLC, into a leading multimillion dollar business. Paul has managed more than 300 projects throughout the country. Paul specializes in rehab and contacting systems for successful real estate investors. At any given time, Paul has managed more than 25 development projects with five teams of over 35 contractors in nine different cities and three different states.


Watch Paul on TV!

As seen on A&E®'s
"Flip This House"

Clowes - Waterbury, CT


Before and After - Clowes
Exterior — Before
Before and After - Clowes
Exterior — After
Before and After - Rehab Prices

Purchase Price = $135,000

Sale Price = $230,000

Profit after Expenses = $42,950

Restoration Cost After Repairs = $38,000

Description

Large Two family home, 3298 sq/ft with 8 bedrooms and 3.5 bath. House built in 1929 on .12 ac in a nice, quite well maintained neighborhood.
Before and After

Rehab Overview

Property in need of extensive interior renovations as well as brand new roof. Both kitchens were completely renovated with new appliances and countertops. A new heating system was installed in one unit and all bathrooms were renovated as well. Exterior landscaping including white picket fence were completed.

Contractor Overview

Multiple contractors were needed to complete this project. A licensed general contractor was hired for the flooring, kitchen, bathroom, painting and all carpentry. A licensed plumber was hired for the new heating system and plumbing upgrades. A licensed roofing contractor was hired for the new roof.

Exterior

  1. Clean yard of all trash and debris
  2. Repair damaged wood on front deck and on all soffits were needed
  3. Remove front shed porch
  4. Trim all bushed and mulch front yard
  5. Power wash entire exterior of property
  6. Repair wood as needed on back deck and paint
  7. Power wash entire foundation and paint (Cape Cod Grey)
  8. Install new vinyl white picket fence

Roof

  1. Rip existing roof including, including all layers of roofing material
  2. Supply and install new plywood as needed
  3. Supply and install new aluminum drip edge on all eaves and rakes
  4. Supply and install new ice and water barrier on all valleys and eaves
  5. Supply and install Architectural 30 year shingle over 15# felt paper
  6. Reflash chimney
  7. All done to city code and manufacturers specifications
Search for listings now!

Interior — General

  1. Paint scheme: Navajo eggshell walls, semi gloss white trim, flat white ceilings, white closets, white doors
    • Purchase all paint thru Pratt and Lambert
    Color Name Product Code
    Navajo Eggshell Gold Eggshell Navajo Wall Z8291
    Ceiling White Gold Flat Super 1-Coat White Z8100
    Trim White Gold Semi-Gloss Super 1-Coat White Z8300
  2. Patch and paint all rooms in house with above color scheme
  3. Repair all stairs as needed, front and rear, including had rails
  4. Remove all carpeting and install new carpet in all rooms except bathrooms and kitchens
  5. Repair all interior doors as needed (all doors must open and close properly and lock)
  6. Replace all light fixtures (dome, 2 bulb and brushed nickel trim)
Before and After - Clowes
Interior — Before
Before and After - Clowes
Interior — After

Right Apartment — General

  1. Prep and paint all rooms (see above color scheme)
  2. Replace all switches and outlet covers
  3. Install new carpet in all bedrooms
  4. Replace all lights (dome, 2 bulb and nickel trim)
  5. Install new heating system and repair all plumbing as needed

Right Apartment — Kitchen

  1. Repair all cabinets (oak finish) and install new countertop, sink and faucet
  2. Install new countertop(Granicrete)
  3. Install new white appliances (Refrigerator, gas stove and dishwasher – see attached sheet for item numbers)
  4. Repair tile flooring and clean entire floor
Before and After - Clowes
Kitchen — Before
Before and After - Clowes
Kitchen — After
Before and After - Clowes
Kitchen — Before
Before and After - Clowes
Kitchen — After
Before and After

Right Apartment — Bathrooms

  1. Paint according to house color scheme
  2. Install new ceramic tile floor in 1st floor bathroom (white)
  3. Install new tub surround and replace tub diverters
  4. Repair sink faucet and check for leaks
Before and After - Clowes
Bathroom — Before
Before and After - Clowes
Bathroom — After

Right Apartment — Bedrooms

  1. Prep and paint all rooms according to color scheme
  2. Repair all doors as needed
  3. Replace all light fixtures (dome lights, 2 bulb and nickel trim)
  4. Carpet all rooms with new padding and berber carpet

Right Apartment — Plumbing and Heating

  1. Install new gas fired, 2 zone boiler
  2. Install new baseboard radiation throughout entire unit (conduct heat lose first)
  3. Install new tub diverters, kitchen sink and faucet.
Before and After - Clowes
Heating — Before
Before and After - Clowes
Heating — After
Search for listings now!

Left Apartment — General

  1. Prep and paint all rooms as per house color scheme
  2. Repair all doors and replace all hardware
  3. Install new carpet in all rooms and new vinyl in kitchen and bathroom
  4. Replace all lighting (new dome with brushed nickel trim)

Left Apartment — Kitchen

  1. Demo kitchen, patch and prep and paint
  2. Install new oak finish cabinets
  3. Install new countertop (Granicrete), new faucet and sink
  4. Install new white appliances (Refrigerator & gas stove – see attached sheet for item numbers)
  5. Install new vinyl flooring
  6. Replace light fixtures (dome with brushed nickel finish)
  7. Repair back door

Left Apartment — Bathroom

  1. Replace tub surround on 2nd floor bathroom and install new diverter
  2. Replace toilet in 2nd floor bath and new vinyl flooring
  3. Repair leak by sink
  4. Replace medicine cabinet and all lighting
  5. Install new vinyl flooring in 1st floor bathroom
Before and After - Clowes
Bathroom — Before
Before and After - Clowes
Bathroom — After

Left Apartment — Bedrooms

  1. Patch all walls were needed and paint all rooms
  2. New Berber carpet and padding in all bedrooms
  3. Replace all light fixtures (dome lights, 2 bulb, nickel trim)
  4. Repair all doors as needed and install new hardware

Left Apartment — Basement

  1. Remove all trash and debris
  2. Repair all doors including Bilco doors
  3. Spray entire basement white
  4. Repair lighting as needed
  5. Inspect washer and dryer hook up and repair as needed
  6. Service furnace for left side and both hot water heaters
  7. Repair stairs as needed and paint
  8. Inspect electrical panels

FINAL COST BREAKDOWN

  1. Carpenter – $16,500.00
    • Painting Interior
    • Exterior work
    • Kitchen Remodels
    • Bathroom Remodels
    • Flooring – carpet and vinyl
    • All finish work
  2. Roofing – $14,000.00
  3. Heating and Plumbing – $6,000.00
  4. Miscellaneous and City Permits – $1,500.00

Total Repair Cost = $38,000.00

Before and After